http://dbpedia.org/ontology/abstract
|
The UNEV pipeline is an 399-mile (642 km) … The UNEV pipeline is an 399-mile (642 km) long pipeline from Woods Cross, Utah, USA, to the Las Vegas Valley at the . This 53-acre (21 ha) facility has the capacity to store 330,000 barrels (52,000 m3) of product. Expansion of the North Las Vegas Terminal was completed in 2014. An additional terminal facility, the 30-acre (12 ha) Cedar City Terminal, is located in Cedar City, Utah, with the capacity to store 200,000 barrels (32,000 m3) of product. This line is the second oil pipeline for Las Vegas, adding capacity and a second source to the Calnev Pipeline. Completion was planned for operation in the spring of 2011. Commencement of operations was delayed to 2012 and is now operational.as delayed to 2012 and is now operational.
|
rdfs:comment |
The UNEV pipeline is an 399-mile (642 km) … The UNEV pipeline is an 399-mile (642 km) long pipeline from Woods Cross, Utah, USA, to the Las Vegas Valley at the . This 53-acre (21 ha) facility has the capacity to store 330,000 barrels (52,000 m3) of product. Expansion of the North Las Vegas Terminal was completed in 2014. An additional terminal facility, the 30-acre (12 ha) Cedar City Terminal, is located in Cedar City, Utah, with the capacity to store 200,000 barrels (32,000 m3) of product.re 200,000 barrels (32,000 m3) of product.
|